Solariance-API-V1
    • Getting Started
    • Authentication
    • Time and intervals
    • Data and resolution
    • Changelog
    • Use Solariance in Claude
    • Forecast
      • forecast/power
        GET
      • forecast/energy
        GET
      • forecast/temperature
        GET
      • forecast/export
        GET
      • forecast/correction-factors
        POST
      • forecast/market
        GET
    • System
      • system/list
        GET
      • system/view
        GET
      • system/create
        POST
      • system/update
        PUT
      • system/delete
        DELETE
      • system/forecast_status
        GET
    • User
      • user/view
        GET
      • user/update
        PUT
    • Measured
      • Measured irradiance (not live yet)
      • measured/irradiance/upload (not live yet)
        POST
      • measured/irradiance: read (not live yet)
        GET
      • measured/irradiance: erase (not live yet)
        DELETE
    • Portfolio
      • portfolio/schedule
        GET
      • portfolio/forecast
        GET
    • Schemas
      • IrradianceUploadRequest
      • IrradianceSeries
      • IrradianceValuePair
      • IrradianceSensor
      • IrradianceUploadResponse
      • IrradianceConflictResponse
      • IrradianceUploadData
      • IrradianceTotals
      • IrradianceSeriesResult
      • IrradianceRejection
      • IrradianceWarning
      • IrradiancePreview
      • IrradianceReadResponse
      • ErrorData
      • IrradianceSensorList
      • IrradianceSensorValues
      • IrradianceSensorView
      • IrradianceRow
      • IrradianceEraseResponse
      • ErrorResponse
    Impressum
    Datenschutz

    Time and intervals

    How the forecast endpoints label time, and what a value covers.

    A row covers an interval that starts at its time#

    Every forecast row describes an interval. Its time is the start of that interval, and step is its length in minutes.
    FieldMeaning
    utc_timeStart of the interval, UTC
    local_timeThe same start on the clock named by time_zone
    stepLength of the interval in minutes (15, 60 or 180)
    ac_output_of_systemMean AC power in W over the interval
    energy_in_time_intervalEnergy of the interval in kWh
    energy_aggregated_sum_intradayRunning total in kWh through the end of the interval; starts again at local midnight
    The row at 12:15 with step 15 is 12:15 to 12:30. A local day has the rows 00:00 to 23:45, so 96 quarter hours, or 92 and 100 on the days the clocks change.
    The step grows with the horizon: 15 minutes for roughly the first 48 hours, then 60, then 180 minutes (see the page Data and resolution).

    Use utc_time as the key#

    utc_time is unambiguous on every day of the year. On the autumn clock change, local_time repeats one hour.
    forecast/power writes utc_time without a zone suffix (2026-11-03T12:00:00); forecast/temperature writes it with Z (2026-11-03T12:00:00Z). Both are UTC.
    time_zone names the clock of local_time: the system's own time zone, set from its country (for example Europe/Berlin, Europe/Vienna, Europe/London). Every forecast endpoint uses it, so day=0, the running total's reset at midnight and local_time all follow the clock where the system is.
    forecast/power also returns now_local and utc_offset_minutes: the current time on that clock, so you can pick the rows "from now on" without a time-zone database.

    Days#

    day=0 is today on the forecast's local clock, day=1 tomorrow, and so on. Ask for several days with a comma-separated list: day=0,1.
    How far ahead you may ask depends on your plan (Free: today and tomorrow, paid plans: 5 days). A day outside the plan answers 400 and names the allowed range.
    forecast/energy returns every day of your plan from today on; the total for today includes the hours already past.

    Freshness and empty answers#

    generated_utc says when the forecast you received was calculated. forecast_status is ready, or provisional for the first forecast of a new system.
    When there is nothing to return yet, for example right after system/create or when a requested day has not been calculated, the answer is 204 with no body and these headers:
    HeaderMeaning
    X-Solariance-Forecast-StatusWhere the forecast stands: queued, delayed, failed or stale while it is missing; ready or provisional when only a requested day is not calculated yet; awaiting_first_weather on forecast/temperature for a new location
    X-Solariance-Forecast-EtaWhen the forecast is expected
    Retry-AfterSeconds to wait before asking again
    While a new system has no forecast yet, these empty answers do not count against your hourly budget; later ones do.

    Values you send to the Forecast Optimizer#

    Production values you upload follow the same rule: a value is the mean power in W over the interval its time opens, so 10:00 with hourly data is 10:00 to 11:00. If your meter labels an hour by its end, send interval_label=end. Details: forecast/correction-factors.
    Modified at 2026-11-23 01:52:32
    Previous
    Authentication
    Next
    Data and resolution
    Built with